The 908 – Draft System Installation

  • Project: Draft System Installation
  • Client: The 908
  • Location: Long Beach, CA
  • Services: Draft System, Design Consulting, Walk-in Cooler, Glycol Chiller, Custom Draft Tower, Nitrogen Processor, Kitchen Refrigeration Equipment, Kitchen Cooking Equipment, Ice Machine

With an innovative new concept and hip new location, The guys at The 908 assembled an all-star team to bring their vision to life. Every mission begins with proper planning, and The 908 enlisted Draft Beer Intelligence’s expertise during the design phase. DBI worked closely with IDA architects, assisting with kitchen and bar layout, equipment selection and installation, walk-in cooler sizing and contractor selection, and a hand grenade. Early involvement in the project allowed DBI to ensure each detail was well thought out. 

There may not be a better looking draft tower, with a better looking background in existence.

Custom 16 faucet draft tower in 6 ½” brewery pipe with galvanized steel finish.

A nitrogen processor filters nitrogen from the air at a 99.8% purity, delivering high-quality nitrogen to the draft system.

Custom regulator panels deliver a precise carbonation level to each keg individually, while FOB’s reduce product waste when the keg is changed.

Draft Beer Intelligence’s glycol chiller with outdoor housing keeps draft lines between the keg room and the draft tower cold. The draft system was designed so that each side of the tower has a dedicated pump.